The Silwood Video Archive Project

We are delighted to announce that this month we will be launching the SILWOOD VIDEO ARCHIVE PROJECT, an archive-based participatory film project.  

This pioneering project will: digitise and upload archive video filmed with the Silwood Video Group for the public to watch; encourage community viewing and tagging; run a short series of participatory editing workshops for up to 20 participants; and produce a co-authored short film using Silwood archive footage.

The Silwood Video Archive Project is supported by The Audience Agency’s Digitally Democratising Archives project thanks to funding from DCMS and the National Lottery, as part of The National Lottery Heritage Fund’s, Digital Skills for Heritage initiative.

Spectacle has 40 years experience in community-led filmmaking developing collaborative documentaries and participatory video methods. Spectacle’s Silwood archive has been created over 20 years of collaborative filming and video making at the Silwood estate on the border of Lewisham and Southwark in Southeast London. 

For news and updates on the project – SIGN UP HERE, or email projects@spectacle.media.

Background: Spectacle and Silwood 

In 2000 Spectacle’s founder Mark Saunders ran participatory workshops on the Silwood Estate in southeast London. He had been asked to work with residents for a few weeks – teaching them how to shoot video and maybe making a short film as part of the planned regeneration work in the area. 

After a few months, the funding ended, but Spectacle never left. For twenty years the Silwood Community Video Group has been filming in and around the Silwood Estate, documenting daily life and changes created by regeneration.

The relationship between Spectacle and Silwood resulted in several short films, web clips for the Channel 4 series Unteachables, an ICA exhibition, as well as further exhibitions at the BOZAR – Centre for Fine Arts in Brussels. This work has been funded by numerous grants, including the INTERREG Apango project, and has brought skill training, jobs, and investment to the Silwood Community. 

In 20 years, Spectacle has run hundreds of video workshops for participants aged from 8-80 from a wide range of backgrounds to tell their own stories. In that time Silwood Estate has undergone immense changes. Brutalist estate buildings have been razed, the community that lived there was scattered to other parts of London, and for those that remained the promises made to maintain community facilities have not been fulfilled. Filming continued every year until the pandemic hit in 2020.

The Archive Project

Understandably, the incredible volume of filming has generated a tremendous video archive – over 300 hours which Spectacle maintains.

With the support of the Audience Agency, we use online participatory editing tools to open this archive. We will invite the Silwood community to watch, comment on, and begin a participatory editing process which will draw out the story(ies) of Silwood.

This initial project will have three stages.

Stage 1

Spectacle will review the archive, edit selections, upload the archive to Vimeo. We will reach out through networks to the Silwood Community who will engage in tagging and providing metadata for the video archive. Spectacle will analyse this collection of notes, views, opinions, and responses to the archive footage. 

Stage 2

After reviewing the community response, Spectacle will convene a group of up to 20 interested community members to participate in a series of collaborative editing workshops. During 6 workshops participants will develop a short (30 minute) film or several short (5 minute) film clips from the archive through a process of viewing, discussing, and suggesting edits. Between each session, Spectacle will implement the participants’ editing suggestions. 

If the participants choose, there is the possibility of conducting Zoom interviews to collect oral histories and add current perspective on the material they are working with.

Stage 3 

Once the participants have created the rough cut of the film, Spectacle will polish the material with a final professional edit including sound design, graphics, and adding any further images that might be needed. Stage three will culminate in a screening of the film for the community. 

Impact

We are very excited that this project will allow us to make the Silwood archive accessible to the community for the first time and we envision it will enrich and sustain this 20 year collaboration. 

Further, we hope that this project will be a springboard for the community and Spectacle to attract future funding to develop the project further both by exploring the archive in more depth but also running filming workshops inspired by the archives.

At the largest scale, we imagine that this project could serve as a reproducible pilot for the many UK communities who have experienced bombing, “slum clearance”, neglect and decline of 60s Brutalist housing estates, large scale decanting, dispersal, demolition and regeneration.

If you want to get involved SIGN UP HERE or email projects@spectacle.media

The Silwood Archive project is supported by The Audience Agency’s Digitally Democratising Archives project thanks to funding from DCMS and the National Lottery, as part of The National Lottery Heritage Fund’s, Digital Skills for Heritage initiative.

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Except where noted and excluding company and organisation logos this work is shared under a Creative Commons Attribution 4.0 (CC BY 4.0) Licence
Please attribute as: “Silwood Archive Project (2022) by Spectacle Media CIC supported by The National Lottery Heritage Fund, licensed under CC BY 40

Battersea Power Station under investigation for “dubious” investments

Former Malaysian PM Najib Razak (pictured below sharing a joke with David Cameron and Boris Johnson)  has been charged with corruption over a ‘£3.4bn fraud.’

Caption Competition: Former Malaysian PM Najib Razak, Boris Johnson and David Cameron

The purchase of Battersea Power Station, the biggest property deal in the UK, is under threat after Anwar Ibrahim, the new leader of Malaysia’s governing coalition said it would be investigated as part of “dubious” investments made by the previous administration.

The Guardian reported:

“Anwar Ibrahim’s comments will raise questions about the British government’s commitment to fighting corruption. He said the money trail of the 1MDB fraud ran through London, with $1.83bn of Malaysia’s cash funnelled into a Saudi-British company.

“There was no attempt by British authorities to investigate. But this was a crime using sovereign wealth funds for reckless spending sprees.” he said.

“I say to Britain: you talk about transparency and anti-corruption drives, now is the time for action. I am saying now allow the institutions to conduct investigations fairly and give the necessary cooperation.”

Anwar Ibrahim, the opposition leader spent nine years in prison on charges which have been confirmed as trumped up and politically driven.

We ask how does this impact on the future of the building? The signs are not good. Despite being festooned with cranes there does not seem to be much going on at the site, just the continuation of the demolition by stealth. The east and west walls of iconic art deco brick work have gone. The London luxury property market has effectively collapsed. Many key individuals, including long time CEO Robert Tincknell, have left the Battersea Power Station Development Company (did they jump or were they pushed?).

Are we going to be left, as predicted, with a useless and worthless ruin surrounded by hideous and empty flats that no one wants to buy? Will the poor workers of Malaysia ever see their money back?

You can read more about Battersea Power Station on our blog and watch our film Selling an Icon here:

 

Battersea Power Station: Selling an Icon from Spectacle Media on Vimeo.

‘Battersea Power Station: Selling an Icon’ tells the story of Battersea Power Station from its prominence as a site of industrial power through the years of dereliction, speculation and planning blight to the replacement of the chimneys under the current scheme – a key example of developer-led preservation. In an age of aggressive ‘big business’ redevelopment, the film gives voice to the local communities who are rarely consulted and often overlooked.

Filmed over 15 years, Spectacle’s new documentary follows the grassroots campaigns of Battersea Power Station Community Group to preserve the building for the public good. It takes us straight to the heart of the current conservation debate about whether – and how – historic buildings should be preserved, governed, modified or replaced, and ‘who’ they belong to.

Also available to purchase on DVD. For institutional buyers and public screenings, please contact us at distribution@spectacle.co.uk.

Memories of Battersea: Nick

Memories of Battersea is an oral history video project run by Spectacle and part funded by the Wandsworth Grant Fund. The project gives young adults from Battersea the opportunity to be trained in film-making while producing short films about their neighbourhood, collecting memories from elder Battersea residents, bridging intergenerational gaps and engaging with the history of their borough.

In this video, Spectacle met Nick Wood, the eclectic architect who designed and built the Carey Gardens estate in the early 70s in SW8 Battersea in Wandsworth.

Nick Wood, the GLC architect of Carey Gardens estate

Throughout his successful career at the London County Council and the Greater London Council, Nick aimed to create “council estates that didn’t look like council estates”, designing buildings that could provide an enjoyable living environment for its residents. Nick applied Sir Leslie Martin’s theories on land use to design Carey Gardens estate and his model proved that it was possible to achieve high density with low-rise buildings. During this time period, this was seen as revolutionary seeing as high-rise blocks were seen as more fashionable but cost more to build.

The Carey Gardens estate model, designed by Nick Wood

This Memories of Battersea episode gives an insight into the history of social housing, focusing on the effort of building new homes for the Battersea community after the devastation of World War II. Nick also walks through his theory use and intentions on building Carey Gardens as he sits down with an aerial map of the estate. He also mentions the Carey Gardens Co-operative, the tenant management organisation that plans events and coastal trips for the residents, proving how good urban housing design creates vibrant and happy resident communities.

Watch the full film here.

Visit Spectacle’s Memories of Battersea channel on Vimeo to watch other episodes featuring Battersea residents’ stories.

Spectacle’s homepage 

Like Spectacle on Facebook

Follow Spectacle on Twitter

Instagram Spectacle_Media

What’s going on with Battersea Power Station?

Go to ITALIAN version

After a big spike in reporters’ attention following Apple’s decision to move its headquarters into the grade 2 star listed art deco Building, Battersea Power Station has gone quieter in mainstream media over the last months. This doesn’t mean that nothing has changed and Spectacle has been following the latest initiatives of Battersea Power Station Development Company around the beloved building designed by Giles Gilbert Scott. Unfortunately much of the news is not reassuring.

Bad news or good news? Bad and good, as usual, are mixed up in the opacity of corporate communication, where everything can be spun according to the most convenient narrative. In fact, the general public is probably aware that the biggest and richest company in the world, Apple, have expressed their intention to move into the refurbished power plant. Apple has been welcomed almost unanimously in mainstream media (among others:  BBC, The Guardian, Evening Standard) as good news. Meanwhile only Spectacle’s blog reported that the East Wall has been completely demolished in order to make windows and give light to Apple’s offices.

Battersea Power Station - three of the four chimneys have been rebuilt

Battersea Power Station – three of the four chimneys have been rebuilt. (Spectacle, 10/03/17)

This major loss, unreported in the mainstream media, follows a curious ’destroy-to-preserve’  strategy repeatedly applied to portions of the Battersea Power Station. Even though best practice in heritage interventions recommends to keep existing structures, the iconic chimneys have gone and been replaced with replicas. In our opinion this is the most evident distortion produced by developer-led preservation, as shown in our film Battersea Power Station: Selling an Icon.

The demolitions (east wall and chimneys) have been approved by all regulatory agencies (Historic England – former English Heritage – and Wandsworth Council) and justified with the greater good of bringing the Battersea Power Station back to life. But what good has the 9 billion development – one of the biggest in Europe –  delivered so far? The works to rebuild the chimneys have proceeded and, at the moment, three newly built chimneys stick out the spoiled art deco power station. Hopefully Londoners will be able to once again admire the four chimneys back on the Battersea skyline, even though they are fakes. Better than nothing? Maybe. 

PUBLIC NOT PUBLIC

Battersea Power Station Development Company, through it’s Chief Executive Rob Tincknell, have recently announced the opening of a riverside walk in the development area:  “We are delighted that we are able to open new public spaces for London and are starting to bring the power station and its surrounds back into London life” (Reported on the Evening Standard). Despite the enthusiasm in the wording, the ‘public space’ Rob Tincknell is talking about is a private walk squeezed between the river and Phase 1 of the development. This promenade is going to be integrated into the wider riverside walk that will be opened in front of the Power Station. Like the rest of the development, this space is private and merely open to public, which is quite different from being ‘public space’.

BPS_Collage_Riverside

The recently open riverside promenade (Spectacle, 04/03/2015)

While filming the new Riverside promenade, our naive crew, believing in the “public space” hype outlined by the developers, acted as if it was a real public area. Unfortunately we have been brought back to reality when the local security reminded us that the landlord decided that smoking was not allowed on the site. Thanks to this sensible management, our health has been preserved. Nevertheless it seems unlikely that a privately policed space will guarantee free enjoyment of the river. If they were to outlaw picnics (maybe to help food shops in the development) or a protest, there would be little room for complaint: that’s what you get when you privatise public spaces.

The Guardian in the past has warned about the effects already produced by this public/private mix on the shores of the River Thames, that became a “bafflingly complex labyrinth of private obstructions and municipal confusion – and a struggle over land rights that could have serious consequences for common access to the river”. Not a great prelude to what developers offer as a unique experience.

PLANNING NOT PLANNING 

The pretentious 230 pages long ‘manifesto’ on Place Making put forward by the Battersea Power Station Development Company gives paramount importance to mixed use and mixed tenancy. Despite the commitment to deliver housing (and some affordable housing) to London’s population, the Malaysian consortium that leads the development has changed its mind, switching from luxury flats to offices.

THE_PLACEBOOK

Cover page of Battersea Power Station Development Company book on ‘place making’ (2014)

Battersea Power Station Development Company have put forward an application for a change of use for Phase 3 of the project. Developers are seeking to turn two buildings, by starchitects Frank Gehry and Norman Foster, – whose flats have already been displayed for sale – from residential to office use. The Financial Times, reported the proposed change is due to a drastic drop in the prime housing market price, whereas demand for office space seems to be holding a higher value. Rob Tincknell in the Financial Times had to justify the plan: “The great thing about a long-term scheme like this is we can adjust with the markets. If there’s no residential market and a very strong office market then we will build offices”.

The same Tincknell that now praises flexibility, in the past gave an interview to Peter Watts, for his book “Up in Smoke” about the history of Battersea Power Station, making clear how Battersea Power Station Development Company came up with their surefire recipe to make Battersea the perfect place: “57% residential. Of the remaining 43% that’s about 3.4m sq ft, 1.2m retail and restaurants, 1.7m sq ft of offices and the balance in hotels, leisure and community space.” We wonder what happened to the pseudo-scientific plan for mixing uses and people in the “new place”, allegedly the result of a long consultation with local people. Maybe it wasn’t that important, since Tincknell tells the Financial Times now that “I could easily see us adding another million square feet (of office space)” and taking out a hotel and lots of residential from the scheme.

Battersea Power Station Community Group, virtually the only critical voice in the neighbourhood whose opinion has never been taken into account by the developers, have stood against the proposed plan: “The Gehry and Foster blocks should become social, affordable and mid-priced housing. There could be some office space at the lower levels. But with a housing crisis in London of unprecedented severity, these buildings should not be given over to offices in their entirety”.

Keep following our blog for updates and other contradictions produced by the big bang development of Battersea Power Station

Watch more videos on Battersea Power Station
Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.

Spectacle homepage                                                                                                      Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Battersea Power Station – The untold story of the East Wall.

According to news emanating from the developers of Battersea Power Station via the Evening Standard– Apple (the suits not the manufacturing) plan to occupy almost half of the beloved art deco building (500,000 square feet) in 2021, relocating 1,400 of its employees from Oxford Circus to Giles Gilbert Scott’s masterpiece.

Despite the expectation of a bright future, the shine has come off the PR coup as the building Apple is moving into, won’t be the Battersea Power Station, but rather a new built Battersea Fake Station. After decades of demolition by stealth, in order to provide daylight to the new office spaces, the East Wall has been demolished. The celebrated expanses of patterned brickwork will be replaced with new Art Deco-Style windows.

The historic brick work East Wall came down just a few weeks ago. It was only after the white plastic scaffold covering was removed that activists and residents realised that the East wall had gone.

East side of the Battersea Power Station without the wall - Work in Progress...

What’s left of the Battersea Power Station – The unexpected demolition of the East Wall.

Battersea Power Station and the unexpected demolition of the East wall.

View from the East side of the Power Station without the wall – Demolition in progress … (?!)

Silence in the news left everyone unaware of this latest act of heritage vandalism. Why this lack of information? And what’s the reason behind this decision to demolish? Conservation or profit?

In our film ‘Battersea Power Station: Selling an Icon’, Nigel Barker, Planning and Conservation Director for London at Historic England (formerly English Heritage), described the principle of putting glazing into the East Wall as “quite challenging”.

He added: “One of the key characteristics of the power station was large blank areas of patterned brickwork.”… “If you are going to use that building, if it is going to have a new future then you are going to have to get new light in there.”…”So the decision was taken. Providing (that) the glazing is done in a way that respects and responds to the original design, then we can see it happening.”

Battersea Power Station Development Company got planning permission to put windows in the wall. But what Spectacle and the residents did not know is that they had to knock down the whole wall to realise this plan. Did Historic England know? If so, how does it fit in with their principles of conservation?

Plastic model of the Power Station redevelopment plan.

Plastic model of the Power Station redevelopment plan.

Brian Barnes, founding member of the Battersea Power Station Community Group that has fought for the protection of the site since the 1980s, said that everything has been done “behind closed doors” without any consultation. He reminds us that behind the development planning application there are over 600 documents and many subsequent “variations” which makes it hard to grasp what exactly is going on.

The lack of clarity and the broken promises leave residents and fans of the Art Deco masterpiece with many unanswered questions about the future of Battersea Power Station-  the biggest brick building in Europe.

Rob Tincknell, CEO of the Battersea Power Station Development Company, told The Guardian: “to fill the power station with shops, offices, luxury apartments and £30m-plus penthouses, and surround it with yet more apartment blocks [… is] paying for this [restoration]. You don’t just regenerate this out of thin air.” But this is not restoration: it is desecration.

It started with John Broome in the 1980s who demolished the West Wall and took off the roof. This three decades long process of demolition by stealth of the heritage site has been allowed by Wandsworth Council.

As we can see, the West Wall has never been rebuilt.  Apparently the plan is to create a glass wall so that the luxury ‘ghost’ flats can have the daylight coming through. But the questions are – Who is going to profit and at what cost to us all and to the future generations? Why have the agencies responsible for the protection of our heritage connived in this greedy exploitation of our cultural assets?

Battersea Power Station – what is the future?

Our film Battersea Power Station: Selling an Icon, has recently been screened at Goldsmiths University, in Leiden as part of the LISFE Architecture Week, and at the 3rd International Congress on Industrial Heritage in Lisbon. These screenings have generated further interest in the tragic plight of this building and the detrimental effects of developer led conservation on listed buildings. Combined with the recent unveiling of the new Tate Modern extension, it raises questions over how the unlisted Bankside Power Station is protected by public use and interest, while the listed Battersea Power Station, still standing with just one chimney, is for private profit only.

BPS

Battersea Power Station with one fake chimney.

Keith Garner, an architect who works on the conservation of historic buildings and landscapes, is a member of the Battersea Power Station Community Group, and is featured in the film. At the Lisbon conference, Garner and Kett Murphy delivered a presentation, ‘Power Stations for the People’, which highlighted the comparison between the redevelopment of Battersea Power Station against that of Bankside Power Station, which has since become the Tate Modern. While Bankside was regenerated for recreational purposes very successfully, Battersea Power Station continues to lie at the mercy of aggressive speculative development. The contrasting redevelopment of these two buildings is crucial in understanding the issues of building preservation in an age of redevelopment.

Both Bankside and Battersea Power Station were designed by Sir Giles Gilbert Scott, described as ‘cathedrals of power’, and considered of major architectural importance. And yet, when it came to development plans for both buildings, only Bankside’s value as a potential public asset was considered. When the Tate Modern acquired the building in 1994 to house a collection of modern art, it ultimately revitalised the area, while still maintaining the original character of the building. The transition from power station to art museum is today considered a huge success. Following the gallery’s £260m revamp, which was launched on June 17, the Chairman of the Tate stated that: ‘A building that was once London’s beating heart is now its cultural cathedral.’

However, as Garner and Murphy highlighted at the Lisbon conference, the development plans for Battersea Power Station don’t seem to be focused around the preservation of a listed Art Deco building, or the drive to create another cultural space like the Tate. Under the financing of Malaysian real estate investment consortium, led by Sime Darby, the power station will be swamped by high rise, luxury apartments, enclosed in a gated community and only accessible to the public during the day. As we have previously reported, the power station itself is in danger of becoming virtually unrecognisable, with growing concern over whether the iconic chimneys will ever be rebuilt. Unlike the regeneration of the Tate Modern, whose success is ultimately based on its inclusivity and openness, Battersea, as we have tried to highlight in our film, is becoming defined by its elitism and exclusivity. Despite Boris Johnson’s pledges that property developed at the power station would be sold to Londoners first, our investigations suggest otherwise, with findings exposing that 55% of the homes sold so far actually went to foreign money.

Battersea’s ‘regeneration’ threatens to be solely for the purpose of private economic gain. As Garner asserts, the developers have taken ‘no account of its (Battersea Power Station) dignity, reverence and serenity.’ The Battersea Power Station Community Group’s plans have ultimately been realised in the Tate Modern. However, the recent Switch House extension, a 200ft pyramid-like tower featuring three new galleries and a panoramic roof terrace, just reinforces how, if re-development and preservation had started with Battersea rather than Bankside, which is a third of the size, no such extensions would have been needed. Instead, funds are raised in order for the Tate to house 60% more artworks, whilst Battersea Power Station falls into further dereliction.

Through the re-circulating of our film, these issues of developer led conservation are once again being brought to attention. The way the Tate extension is being praised for transforming the building into ‘one of the world’s cutting edge art spaces’, only emphasises the stark contrast between the two power stations. Our film remains essential in raising an awareness that heritage led regeneration cannot, ultimately, be short-circuited, and that respect for the historic environment is paramount.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Battersea Power Station: Selling an Icon

We are pleased to announce the launch of the film Battersea Power Station: Selling an Icon.

Battersea Power Station: Selling an Icon from Spectacle Media on Vimeo.

Battersea Power Station: Selling an Icon tells the story of Battersea Power Station from its prominence as a site of industrial power through the years of dereliction, speculation and planning blight to the replacement of the chimneys under the current scheme – a key example of developer-led preservation.

Filmed over 15 years, Spectacle’s new documentary follows the grassroots campaigns of Battersea Power Station Community Group to preserve the building for the public good. It takes us straight to the heart of the current conservation debate about whether – and how – historic buildings should be preserved, governed, modified or replaced, and ‘who’ they belong to.

Battersea Power Station: Selling an Icon is unique in raising awareness to the plight of historic building preservation in an age of aggressive ‘big business’ redevelopment and gives voice to the local communities, rarely consulted and often overlooked.

The project was made possible by World Monuments Fund through support from American Express.

The film is available for free private viewing for individuals. Institutions and libraries can buy or rent the film on Vimeo on Demand.

It is also possible to purchase a DVD on our web page.

Watch more videos on Battersea Power Station
Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.

Spectacle homepage

Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Battersea Power Station – from no mans land to architectural extravaganza

 

bps small web

The iconic Battersea Power Station is at the heart of Rafael Vinoly’s master plan – a massive “regeneration” scheme for Battersea.

The riverfront district of Southwest London around the Battersea Power Station will soon be unrecognizable due to a huge “regeneration” scheme. The Battersea Power Station which has remained largely unused since its closure in 1983 is at the heart of this luxury housing development financed by a Malaysian real estate investment group Eco World.

This regeneration scheme has recently hit the headlines with its culmination London’s first ‘sky pool’, a swimming pool which has been planned to bridge two 10-storey buildings in Embassy Garden’s as a part of the Battersea “redevelopment” plan.

However Nine Elms ‘sky pool’ has not been acclaimed by everyone. A private swimming pool sky bridge in the middle of London’s affordable housing crises has stormed critique as a symbol of rising inequality. The recent newspaper headlines show the other side of the story of the highest residential swimming pool in London:

The Independent wrote: “Nine Elms ‘sky pool’: luxury London flat owners  will be able to swim while literally looking down on everyone else”.

In addition, The Guardian stated: “The ‘sky pool’ is just the start: London prepares for a flood of bathing oligarchs”.

The planned luxury flats are being criticized for being aimed at wealthy foreign buyers taking advantage of the rising value of property in London. In January 2013 the first residential apartments went on sale and now all of the Thames-facing apartments have already been sold, way before the project was even launched.

Last year the reselling cycle made possible that the flats with starting prices from £1 million were on sale later on the year for £1.5 million. However the rapidly increasing prices are only a one side of the issue. The fundamental conflict lies on the fact that only 16 % of the planned new homes (560 of the total of 3,444) will be affordable housing.

pbs model

The “redevelopment” of Battersea would change the Landscape of London – the iconic Power Station would be surrounded by huge building blocks.

Since the power station ceased generating electricity in the 80s, it has become one of the best known landmarks in London. As the largest brick building in Europe, the iconic power station was listed on the World Monuments Watch by the World Monuments Fund in 2004.

During the past 50 years, numerous redevelopment plans for the Battersea Power Station have been introduced. However these projects have usually failed due to a lack of funding. In 2010 Real Estate Opportunities were granted permission to redevelop the power station. This resulted in the creation of the current master plan for Battersea, an architect Rafael Vinoly’s design which gained planning consent from Wandsworth Council in 2011.

However, Vinoly does not have exactly a clean architectural record. According to the BBC the ‘Walkie Talkie’ skyscraper on Fenchurch Street in London had been blamed for reflecting light and causing a ‘death ray’ with a high temperature. The 37-storey tower designed by Rafael Vinoly was claimed to damage vehicles by melting parts of them and even causing fires.

Last week Building Design magazine announced that Walkie Talkie, nicknamed because of its bulbous, curving shape was voted for the worst building in London. Building Design’s annual Carbuncle Cup sparked an online debate including not so flattering comments about the building such as one reader commenting: “I now have a new personal goal: to live long enough to see this building demolished”.

Now the planned Phase 3 with proposals for the future of Battersea and the power station has been revealed by the Battersea Power Station Development Company, a Malaysian consortium in charge of the project. The Phase 3 of the project will provide 1,310 residential homes with only 103 of them being affordable which is less than 8 % of the houses that are planned to be build.

Will this solve the growing divide in the London housing market? Very unlikely. So far it seems that the beneficiaries are the wealthy few who the housing crisis doesn’t hit with its sky-high prices.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

SPECTACLE ANNOUNCES NEW FILM ON BATTERSEA POWER STATION

PRESS RELEASE: SPECTACLE ANNOUNCES NEW FILM ON BATTERSEA POWER STATION

Where's the Chimney?

Where the Ducks the Chimney? Battersea Power Station 2015

Spectacle has announced that work has begun on its new film about Battersea Power Station, commissioned by the World Monuments Fund and American Express. The film is due for release in Autumn 2015.

The film will look at the historical and architectural significance of the power station, as well as the tireless efforts of the Battersea Power Station Community Group (BPSCG) which have led a grassroots campaign to preserve the building for the public good since the early 80s.

Working with the BPSCG, the film will raise awareness to the plight of building preservation in an age of redevelopment. The redevelopment of Battersea Power Station has aroused a passionate and highly-charged debate about whether – and how – iconic buildings should be governed, preserved, modified or replaced, and ‘who’ they belong to. As Colin Thom concludes in the Survey of London Chapter: “Perhaps more than any other structure today it represents the impotence of the heritage lobby when faced with big business at its most rapacious.”

The film will follow this debate in an even-handed, factual and interesting way, becoming a case study for similar issues in other cities around the world where a historic building finds itself on a high value site.

From gracing the covers of a Pink Floyd album to generating a fifth of London’s energy at its height, Battersea Power Station is a creation steeped in industrial history and rich in meaning. With stunning imagery throughout the ages – some from Spectacle’s archive and others newly shot – the film will reveal, in a unique manner, some of that history and meaning. It will raise awareness to the needs for preservation and the current challenges faced by conservation.

***
About Spectacle

Spectacle is an award-winning independent television production company specialising in documentary, community-based investigative journalism and participatory media.  Spectacle has been documenting the changing landscape around Battersea Power Station for the past 15+ years.

Spectacle’s film work has been exhibited at galleries worldwide, including Tate Britain, Tate Modern, Tate Liverpool. The Photographers Gallery, Institute of Contemporary Art, National Film Theatre in London. Glasgow Centre for Contemporary Art, National Architecture Institute Netherlands, Kunstverein Hamburg, Pianofabriek and “Bozar” Brussels.

It’s broadcast films include “Battle of Trafalgar”, (Winner of Prix du Public Nyon Film Documentaire), “The Truth Lies in Rostock” (Nyon Documentary Award Special Mention).  The Guantanamo films- “Outside The Law” &   “Shaker Aamer: a decade of injustice”.

 

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

 

DMAU – Participatory Documentary

DMAU’s  research project on Participatory Documentary features a video report that introduces one of Spectacle’s participatory projects APaNGO. The video explains the projects purpose – developing a strong community based network that promotes urban participation in planning through social media.

The central aim of Spectacle’s video workshops is to train residents to film and edit video footage and through this capture and influence the changing physical and human face of their neighbourhood.” Mark Saunders, Spectacle Founder.

DMAU specialises in documentary film-making and urban research. DMAU (or Digital Media Architecture Urbanism) provide a selection of participatory media in the form of visual essays, interviews and case studies.

“Our work focuses on projects – designs and documentaries – that improve the public realm, be that built designs or temporary events and interventions, with an emphasis on work that has a positive social or environmental impact” –                                             Daryl Mulvihill, DMAU Founder.

The scope of this project spreads across various countries in the EU and works upon maintaining strong communities. It is therefore a good example of how participatory media can influence and support social development.

An accompanying interview with Spectacle founder Mark Saunders gives a broader understanding of how Spectacle works with communities to encourage social media. The interview explains the importance that participatory production workshops have, and the significance they have upon urban regeneration.

The DMAU research project explores:

“The potentials for the use of documentary practice in urban research and design projects go much further than the traditionally formatted video production. New interactive documentaries combine film with a range of other media; photography, maps, soundscapes and data visualisations to create an immersive experience for the viewer. Next to this participatory documentary has the ability to empower and engage communities by bringing their story to a wider audience. We will see how interactive and participatory documentary is not simply about producing stories. It is as much about designing a storytelling process that engages with the voices of people impacted by an event or ongoing situation.”

Spectacle now runs affordable effective Participatory Video Weekend Training Courses

Visit the aPaNGO Project
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Spectacle homepage