London Evening Standard loves the future outlook of a wrecked Battersea Power Station

To start with, a few months ago the London Evening Standard proudly presented their collaboration with the owners of the Battersea Power Station on the ‘The Power 1000 – London’s most influential people 2013‘.

BPSeveningstandardpower1000_1

The endangered building was used as a backdrop for the party, no one seemed to be scared of the chimneys collapsing on them, even though the Standard had previously reported that they must be unsafe. The uncritical, back slapping love-in was topped with speeches from Boris Johnson, Mayor of London, Sarah Sands, Evening Standard Editor and Rob Tincknell,  Battersea Power Station chief executive.

And in the 13th November edition about ‘Battersea’s rebirth’ they enthusiastically trumpet the ‘creation of a completely new district where none existed before’.

Wandsworth Tory Leader Ravi Govindia claimed the area will “change faster and more dramatically than any other part of London”- perhaps but maybe not for the better.

As is their custom the owners of Battersea Power Station attempted to deflect the mounting criticism of their plans to demolish the chimneys by wheeling out their gimmicky use of the top of the chimneys, this time not for a single table restaurant, but a viewing platform.

A double page free puff for the Battersea Power Station project:

BPSeveningstandardFULL

Don’t expect the Evening Standard to be digging too deep, or indeed reporting at all, on the controversies surrounding the Power Station demolitions.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Battersea Power Station -masters of spin

The new owners of Battersea Power Station may not know much about property development, but they do have excellent PR. The hugely successful Open House London day attracted tens of thousands of visitors who queued for hours to catch a brief glimpse of this much loved building.

OLYMPUS DIGITAL CAMERA

However, in PR terms, it was a bit of an own goal. As only a few days later, the World Monuments Fund listed Battersea Power Station as an endangered world heritage site. See our blog on this.

This very significant listing was hardly commented on in the media. Despite its big PR it was’nt even mentioned in the very slick newsletter of the owners. The inclusion was only visible in some mainstream media:

”Battersea Power Station ‘at risk’ says the heading of an article in the Times. And according to the the Express:

”The Grade II listed London landmark is among 67 heritage

sites that are at risk from natural, economic, social and political forces according to The World Monuments Fund (WMF). The decommissioned coal-fired power station was joined on the list by the beautiful Italian city of Venice and the little known Hong Kong village of Pokfulam.”

The Local Guardian on the inclusion:

”WMF have said they aim to keep a spotlight on the current redevelopment plans for the station, particularly focusing on the re-building of it’s four chimneys.”

Noticeably, they claim it to be one of the best-loved landmarks of the capital.

The Evening standard did not mention this embarassing listing either. Since they recently made Battersea Power Station a front cover image as part of their association with “The Power 1000 – London’s most Influential People” critical reporting of Battersea Power Station from the Standard, which was always weak, has been significantly lacking.

See our full article about the owners’ pro – active approach to media management.

Interestingly, the owners were unable to provide visitors with updated information about the new phasing of the demolishing of the chimneys. This was left to a small group of local volunteers of the Battersea Power Station Community Group.

Watch our video about the demonstration against these plans during London open house.

The owners have also not mentioned their plans to make a bio fuel power station. If you think bio fuels sounds good, look at this chart. And then there’s the PR problem with main partner Sime Darby’s significant role in deforestation and the extinction of the Orang u Tang.

Despite these obstacles, they are still winning the PR – war as many people believe they are going to start to renovate the Power Station “at last”. However, phase 1 is only building ugly greedy soulless flats for investors that will block most of the views. And phase 2 involves demolishing the chimneys and, they claim, replacing them with replicas.

The current agreement is that they have permission to take down one, and that is including the art deco brickwork on the top. They will rebuild the first one to 25 meters, which is about halfway. When they have reached that point, they can take the other three chimneys down and then they will continue rebuilding the first.
So it’s essentially one plus three. Now at some point down that route, if there’s a default, the developer either refuses, or claim they ‘cannot put them back up’ or they run out of money, the chimneys, like the roof, will not be put back. The cost of putting back three and a half chimneys is massive- far more than the “bond” being asked.

BPSsavethechimneys

They are also not keen to draw attention to their recent request to dismantle the two listed cranes that are disgracefully being allowed to rust away, in order to provide a jetty for taking underground extension tunnel soil out via the river. They have a very long water front it is typical that they should insist it can only work by demolishing the cranes.

To us and any one interested, except English Heritage and Wandsworth council who collude in the hidden master plan, the owners are pursuing a policy of demolition by stealth.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Letter to Architects Journal on Battersea Power Station phase 3

Keith Garner‘s ( architect and member of the Battersea Power Station Community Group) non-edited letter to the Architects’ Journal.  A critical look at Foster and Gehry, the chosen designers for phase 3 of the Battersea Power Station:

                       BPS_NewPlan_1

”Your report about the appointment of Foster and Gehry to the Battersea Power Station project hits the nail on the head.  (AJ web site 23rd October.)   New buildings on the Battersea Power Station site would certainly be highly visible “… from passing commuter trains”.  The one thing you won’t see of course will be Battersea Power Station itself,  which would be  obscured by thousands of new flats in blocks up to 18 storeys high, to be built as part of the Viñoly master plan.

This would be a very great shame given the evident pleasure that commuters and visitors to London derive from  seeing  Battersea Power Station from the train:  certainly  to judge by the number of people who take photographs as they go by and then post them on  Twitter and Instagram.

The truth is that the Viñoly master plan is fatally flawed.  This is because the quantum of development it foresees will destroy Battersea Power Station’s significance as an urban landmark.   It really doesn’t matter how distinguished the architects are who design individual buildings. No good will happen at Battersea until the master plan itself is ditched.

Indeed, rather than allowing new commercial buildings to proceed before Battersea Power Station  is repaired,  nothing should happen on the site until the future of the Grade II* listed building is itself secured.  In that regard, Foster & Gehry would be better employed working alongside Wilkinson Eyre on Battersea Power Station itself, rather than in designing new buildings adjacent.

Part of the reason why the current scheme for Battersea Power Station is so wildly off beam is that its underlying premise is to fund the repairs to the listed building from the proceeds of surrounding commercial development.  But if the resulting over-scaled buildings destroy the significance of Battersea Power Station as a urban landmark – as they surely will – then what’s the point?

It would be far better to transfer ownership of Battersea Power Station to a public interest trust and to repair the building with funds from the Lottery.   Rob Tincknell should agree to this: it relieves the consortium of the responsibility of looking after the listed building – something they are plainly not interested in – and lets them get on with the job of making a return for their investors.

The consortium would develop the surrounding site (in a manner that respects the monumentality of the listed building and preserves key views e.g. from the railway viaduct) and would have a lease from the trust for use of the unlisted parts of Battersea Power Station itself, i.e. most of it.   As a quid pro quo for the use of Lottery money, the public would have free access to the listed interiors which could be used for any number of educationally or culturally uplifting pursuits.

This seems like the basis of an equitable settlement to me. What is needed is an organisation to take it forward.  For too long, English Heritage has stood on the sidelines whilst the situation at Battersea Power Station has descended in to black farce.   As the government’s advisor on the historic environment, it should be their responsibility to rescue the building from the fate that currently awaits it and to pursue a civilised alternative based on trust ownership.

Incidentally, the AJ hasn’t – as far as I am aware – reported the news that the World Monuments Fund had just added Battersea Power Station to its list of world heritage in danger for 2014.  This is the second time Battersea Power Station has been added to the list – the first was in 2004 – and reflects the World Monuments Fund’s ongoing concerns about the situation at Battersea and the motivations of the current owners.”

BPS_NewPlan_3

See Merlin Fulcher’s original article that provoked Keith’s comments.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Battersea Power Station added to World Monuments Watch 2014

Finally somebody else noticed the endangered condition of Battersea Power Station.

And it’s even better than just noticing it, the Battersea Power Station will be added to the World Monuments Fund’s list of cultural heritage in danger for 2014.
The Power Station was already listed on the 2004 World Monuments Watch by the World Monuments Fund. So the inclusion also marks the 10th anniversary since the building was first included.

BPSderelict01

Hopefully this happening will draw attention to the continuing failure of a succession of private owners – mostly foreign based – together with Wandsworth Council and English Heritage, to see that the building is properly looked after and given appropriate new lease of life. We also hope that inclusion in the World Monuments Watch 2014 will help to bring about a new and better approach to the preservation of this important building.

Ten years ago, we were told by then owner Parkview that inclusion in the World Monuments Watch was unnecessary and they said: ”Plans for the restoration of this landmark are already well underway” (AJ 02.10.03).   But since 2004 there has been no progress at Battersea Power Station, which has been allowed to deteriorate further.

Parkview sold to Irish developers Treasury Holdings in 2006 which also made no progress and went bankrupt in 2012.  The current owners – a Malaysian consortium – propose to surround Battersea Power Station with blocks of flats up to 18 storeys high, obscuring the famous London landmark from most directions.

The consortium justify the excessive height of the towers by saying this is necessary to fund the restoration of the grade II* listed building.

We are calling for a different approach with ownership of Battersea Power Station transferred to a trust to be repaired using funds from the Heritage Lottery Fund and other sources.  (There are precedents for this: the former Bankside Power Station became Tate Modern with £50m of lottery money and £60m of private money.)

The consortium can develop the flat land at the back (the old South Lambeth Goods Yard site) and develop the unlisted parts of Battersea Power Station itself on a leasehold basis.  But key views of Battersea Power Station must be preserved and there should be free public access to the listed interiors.

The consortium also proposes to carry out Parkview’s plan to demolish the chimneys. This despite an authoritative engineering report jointly commissioned by the Twentieth Century Society, World Monuments Fund and ourselves in 2005 that showed that the case for demolition is not proved.  We fear that the consortium will take the chimneys down and will then invent a reason not to put them back up. They must be stopped.

BPSderelict02

38,000 people visited Battersea Power Station during London Open House, far more than any other building taking part. It is bizarre and anomalous that this hugely popular building has not benefited from Heritage Lottery Fund largesse since the lottery was established in 1995.   We call on English Heritage to take the lead in rectifying this situation.

Battersea Power Station has been described as “… one of the supreme monuments of twentieth century Britain”.  Foreign speculators can no longer be trusted with this important building which must be repatriated forthwith and repaired with public money.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Battersea Power Station Community Group has been campaigning since 1983 to save the listed building. To make a donation click here.

The Battersea Files by Eclipse films – Kevin Murphy  001 520 836 8792

Battersea Power Station Open House, a video by Spectacle.

Further Contact:

Brian Barnes MBE 020 7627 5821 / 07748 554866
Keith Garner 020 7585 0421 / 07876 163638
Ernest Rodker 020 8672 9698
Angela Parkinson 07931 814607
Kett Murphy (USA) 00 1 312 320 2471

Data Leak Reveals the Truth About Palm Oil

Owners of Battersea Power Station,  Palm Oil giants Sime Darby, want to build a bio-fuel power station at the site to power the massive development. To side step criticism they claim not have decided what bio-fuel it will use ( yeah right. Maybe Palm Oil?)

This blog has been sourced from an article by David Carrington, for The Guardian.     Click here if you would prefer to view the full article.

A new data leak has revealed how certain bio-fuels can have a worse impact upon the environment then fossil fuels. Although some bio-fuels can be advantageous in preventing climate change, others such as palm oil are quite the opposite due to the large carbon footprint that they generate.

In distinguishing the good bio-fuels from the bad ones it is also important to account for factors such as deforestation and other man made sources of pollution that are involved in harvesting bio-fuels.

A diagram displaying the individual carbon footprint of bio-fuels in comparison to that of crude oil from tar sands, puts Palm oil just beneath that of the crude oil:

Biofuels

Second generation fuels (SG), particularly those that are land-using such as Biodiesel and Ethanol produce the least CO2. While sugar cane and corn maize are thankfully less harmful then crude oil, however their carbon footprint could still be considered a cause for concern.

Recently, the US environmental protection agency stated that Palm oil failed to meet the US requirement of emitting a minimum  of 20% less carbon then the diesel produced from crude oil. Furthermore, bio-fuels campaigner Robbie Blake for Friends of the Earth Europe further condemned the use of Palm Oil (speaking to David Carrington):

“It’s getting quite indisputable that the use of soy or palm oil to fuel our cars is even dirtier than conventional fossil fuels. Forests in Asia and South America are being destroyed by the expansion of plantations to meet the European market. It’s a delusion for politicians to think that biodiesel will solve climate change.”

An important factor that helps assess how beneficial or environmentally unfriendly bio-fuels are is sourced from research into more sustainably advancements, with the latest examples in sourcing low carbon bio-fuel come from seaweed and algae.

An EU target has been made to ensure transport fuels incorporate 10% of bio-fuels by 2020. However the production of certain bio-fuels has been named ‘unethical’ in relation to the environment and to human rights. Research groups meanwhile have branded it ‘immoral’ to not look for an alternative to using fossil fuels.

For more information on this topic view the full article here, or try these related links:

Issues surrounding the production of second generation fuels, how the EU brands fuel sustainability, other recent studies into bio-fuel carbon footprints.

https://www.facebook.com/BatterseaAgainstBiofuels

http://www.biofuelwatch.org.uk/2013/battersea-biofuels/

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

 

Weeklies Snubbed for Event on Patch

Author: Helen Lambourne, July 9, 2013

Reporters from two weekly newspapers were refused entry to an event attended by Prime Minister David Cameron which was attended by the Press Association and international titles. The Wandsworth Guardian and rival weekly South London Press did not receive invitations to a ground-breaking ceremony at Battersea Power Station last Thursday and were not allowed entry when their reporters attended.

The event, which was also attended by Malaysian Prime Minister Najib Razak and London mayor Boris Johnson, was held to mark the start of work at the 39-acre site, including the creation of 3,500 luxury new homes and leisure developments, and was organised by the Battersea Power Station Development Company.

Jamie Henderson – Chief Reporter at Wandsworth Guardian said “it was disappointing not to be allowed entry because the paper had reported on the future of the site for many years. We thought an invitation would come from them. I thought I would go down anyway to see what was happening.

“We knew there would be protesters there because we found out about the arrival of David Cameron. Their press officer eventually came out and I thought they would let us in but they told us the press area was full.”

“It is pretty galling really that we have not only given this much support to the project but local people want to know through our newspaper what is going on. The reports in the nationals didn’t report on anything to do with the local area. There was nothing about Wandsworth or the people  who are hopefully going to get jobs.”

The Wandsworth Guardian has won the support of a number of Local Councillors and the Public and Commercial Services Union which was protesting at the event.

Cathy Cook, London Campaign Manager for PCS, told the paper:
“At a time when the country is in economic crisis the Prime Minister prioritising a meeting about luxury penthouse flats is a disgrace.”
“What we think is even more of a disgrace is that the local press were denied access to this meeting today. The local press has a major interest in what is going in its locality and its readership will be interested to know that their journalist was not allowed in.”
Having not being allowed access South London Press reporter James Cracknell the day before the event tweeted: “So, a big-name VIP is going to be at Battersea Power Station tomorrow for a ground-breaking ceremony. But I’m not allowed to say who. I’ve also been banned from attending because the South London Press doesn’t qualify as important media.”

On the day of the ceremony, he tweeted: “I was escorted off the premises of Battersea Power Station this morning by a security guard the size of a house. Oh dear.”

The Battersea Power Station Development Company declined to comment.

 

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Battersea Power Station to Lose Chimneys During Renovation

Battersea Power Station could be temporarily left with just one solitary chimney after developers applied to change conditions of work on the listed building. Last week the Battersea Power Station Development Company (BPSDC) applied for permission to change the sequence in which the listed building’s chimneys are rebuilt.

The new application, called a deed of variation, proposes a change to the original legal agreement, between Wandsworth Council and English Heritage, so that the first chimney could be rebuilt on its own.

The power station with one chimney

The remaining three would then be rebuilt at the same time. A safeguard will also be added to the legal agreement which will require the developer to provide a bond for the full value of the chimney works contract before the project can get under way. The council could use this bond to pay for the completion of the project if for any reason the developer failed to finish.

No changes are being proposed to the design of the chimneys which would be constructed according to the original architecture plans so that they match the appearance of the originals. The development company estimates that changing the sequence of the chimney works would mean the power station restoration project could be completed two years earlier.

In 2011 Wandsworth Council and English Heritage approved plans for each of the decayed chimneys to be rebuilt after successive engineering studies showed all four were beyond repair.

Last month the Wandsworth Guardian reported campaigner’s fears the power station could permanently lose its famous chimneys once they were taken down. and a final decision on whether to approve the proposals will be made by the council’s planning applications committee.

“It is entirely plausible the owners will take the chimneys down and then contrive some reason why they can’t be rebuilt. Council planners are now examining the application in detail.’ Keith Garner – Power station campaigner 

View the Wandsworth application and enter reference number 2013/3076.

 

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

Will the chimneys be demolished all at once?

IMG_2198

There is a growing worry about the survival of the chimneys on Battersea Power Station. While expert opinion says they could be repaired the developers insist they have to be demolished and replaced with replicas. To avoid a repeat of the roof situation – ( see Demolition by Stealth)  where Bloom, a previous owner, took the roof off and then claimed he could not afford to replace it- planning permission was only given to demolish and rebuild the chimneys one by one, but now it seems like it is going to be a different story.

South London Press wrote an article in their newspaper this week about the fact that Battersea Power Station Development Company (BPSDC) are pushing towards knocking all the chimneys down at once. This action is something that English Heritage has warned about, since it might result in the chimneys never being rebuilt. Now on the other hand are Battersea Power Station Development Company, English Heritage and Wandsworth council in discussion about removing the clause in the building contract that requires the chimneys being removed and rebuilt one by one. English Heritage have not been able to reassure Battersea Power Station Community Group that they are not willing to change their view on the demolition of the chimneys.

Battersea Power Station Development Company was claiming in an exhibition last week that replacing the chimneys one by one would be too time consuming and would delay the rebuilding and restoration of the power station.

Wandsworth council claims that Battersea Power Station Development Company are examining different ways to rebuild the chimneys, but if there would be a change in the rebuilding strategy, it would have to be approved from the council in consultation with English Heritage.

Is there still not a risk that the chimneys will not be rebuilt if they are taken down all at once? Since it is cheaper, and possible, to repair them rather then to replace them, why would a company who are driven by profit decide to do something that is more expensive? Is it not proof enough to suspect that if the chimneys are gone all at once, there will be a great risk that they are never rebuilt, and rendered historically worthless the power station will be demolished as well.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

The new development in Battersea “is not” only for the rich

1404battersea19ES_415x328

The redevelopment of Battersea Power station has started and as we have written many times before, we are very concerned what the impact of the new neighborhood might have on the existing community.

30-40 percent of the flats have been sold to foreign investors, said the CEO of the new Battersea Power Station Development Company, Robert Tincknell to the Evening Standard last week. He did also mentioned that even if they were bought up by foreign investors, most of the investors will probably rent the flats to londoners. Something that would contribute to the vibrant community they hope to build. He also believes that the new development will be good for local business and that they are trying to be a part of the existing community.

The question still remains, would not a new development with expensive flats make the rent for existing houses higher? Tincknell says that he does not want Battersea Power Station to only be a place for the rich, but with the building plans they got, does it really sound like a place that is not only for the rich?

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter

New playground in Battersea Park

Demolished adventure playground

The adventure playground in Battersea park has now been demolished for three month. Before the demolition Wandsworth council claimed that the One O Clock club had to be closed because of the protesters, but is now going to be opened as a cafe instead.

The rebuilding of the playground has started and the main part is for younger children. There will be a part aimed for older children, but to access this part you need to pay.

So is this new playground really going to be better and safer then the last one? It will probably be safer in the sense that less people are going to be able to enjoy themselves at the playground. And is it really okay to put an age limit on having fun and play and excluding older kids by forcing them to pay? Should it not be free for all or is this part, made for older children, really going to be such a magical place that is worth paying for?

Of course it is just another depressing aspect of the gentrification, privatisation and commodification of the Battersea / Nine Elms area.

Click Battersea Power Station for more blogs
See our Battersea Power Station project pages for more information and videos.
Or visit PlanA our general blog on urbanism, planning and architecture.

Spectacle homepage
Like Spectacle Documentaries on Facebook
Follow SpectacleMedia on Twitter